Q) A and B can do a job together in 7 days. A is 1 3/4 times as efficient as B. The same job can be done by A alone in :
a) 9 1/3 days b) 11 days c) 12 1/4 days d) 16 1/3 days
Ans:
Since A is 7/4 times as efficient as B, therefore A will do 7/4 times work of B.
B’s 1 day’s work = 1/B
A’s 1 day’s work = 7/4 x 1/B = 7/4B
(A + B)’s 1 day’s work = 1/B + 7/4B = 11/4B
Since Time taken by (A + B) to finish 11/4B work = 1 day
∴ Time taken by (A + B) to finish whole work = 1 /(11/4B) = 4B/11 days
By given condition, 4B/11 = 7
∴ B = 11 x 7 /4 = 77/4 days
∴ time taken by A = (77/4)/(7/4) = 11 days
Hence, Answer is [B].
Please do press “Heart” button if you liked the solution.